B E S Lighting
Pre-Bent S Curve MonoRail (9ZLRA)
$325.00
Call For Price
Enlarge Image
Add to Cart
Description:
BROWN MO HORIZ. S-CURVE ANT.B
Availability:
  • Manufacturer availability unavailable.
Required Components:

Optional Accessory:

Dimensions:
right arrow Height: 0.60"
right arrow Width: 0.30"
Additional Details:
right arrow Category: Monorail Hardware
right arrow Finish: Antique Bronze
right arrow Style: Contemporary | Modern
right arrow Option: Dry Rated
right arrow Bulb Dimmable: False
right arrow Introduction Date: 01/01/2005
right arrow Ship Carton Height: 6.00
right arrow Ship Weight: 3
right arrow Special Features: From the brand formerly known as Tech Lighting
right arrow Vendor Ship Method: UPS Fedex
right arrow Warranty: 1 Year
right arrow Weight: 1.10
right arrow 24 Volt: False
right arrow Adjustable Head: False
right arrow Cable Field Cuttable: True
right arrow Cannot Ship To California: False
right arrow Cannot Ship To Canada: False
right arrow Damp Rated: False
right arrow Dark Sky: False
right arrow Dry Rated: False
right arrow FWC Compliant: False
right arrow Integrated LED: False
right arrow Item Color 1: Brown
right arrow Master Color: Brown
right arrow Motion Sensor Included: False
right arrow Photocell Included: False
right arrow Replaceable Lamp: False
right arrow Reversible: False
right arrow Safety Rating: ETL
right arrow Shape: Pre-bent S-curve
right arrow Sloped Ceiling Compatible: False
right arrow Solar Powered: False
right arrow SORAA: False
right arrow Stocking Type: Made to Order
right arrow System: MonoRail
right arrow Title 20: False
right arrow Title 24: False
right arrow Transformer Required: False
right arrow Warm Color Dimming: FALSE
right arrow WET IP65: False
right arrow Wet Rated: False
right arrow Standard Category: Track Ltg.
right arrow Standard Subcategory: Track Accessories
right arrow Standard Finish: Bronze
right arrow Standard Style: Contemporary
right arrow Standard Option: Title 20
full siteFull Site
mobile siteMobile Site
login Login